Automatic Paper Core Bag Making Machine Grocery Bag Food Bag Vegetables Fruit Bag Making Machine with Paper Core on Roll
Overview Product Description These machines are heat sealing and heat cutting bag making machine, which are suit for pri
Description
Basic Info
Model NO. | GBDR-300*2 |
Sealing & Cutting | Heat-Sealing Cold-Cutting |
Layer | Single |
Machine Type | Bag Forming Machine |
Computerized | Computerized |
Type | Plastic Bag Making Machine |
Function | Food Packing Bag |
Bag Methods | Food Bag |
Transport Package | Stretch Film |
Trademark | SILSTAR |
Origin | Made in China |
HS Code | 84778000 |
Production Capacity | 600PCS/Min |
Product Description
These machines are heat sealing and heat cutting bag making machine, which are suit for printing and non-printing bag making. The material of bag is HDPE, LDPE.Bag-on-roll with paper&pvc core production. Its automatic film-break and core-change function help bag suppliers to improve bag making capacity and to reduce energy and man power at the most extent.Its double servo motors control system makes producing more stable. It is the best choice for making bottom sealing printed bags and blank bags.
Product Parameters
Model | GBDR-300*2 |
Bag Width | 100mm - 360 mm |
Bag Length | 200mm - 1000 mm |
Film thickness | 10-35µm per layer |
Production Speed | 80-100m/min x2lines |
Max. Diameter of rewind roll | 150mm |
Film Unwind Diameter | Φ900mm |
Total Power | 13KW |
Air consumption | 5.5HP |
Machine Weight | 3200KG |
Machine Dimension | 6500x2400x2100mm |
Detailed Photos
Company Profile
Silstar machinery founded in 1997, covers an area of 32,000 m2, we focused on film blowing machine, bag making machines for plastic bag, and compostable bag. We have obtained 2 invention patents on garbage bag making machine and labeling machine, 13 utility model patents, which has become one of the leading companies in this industry. By now It has already got the CE certification, ISO9001 quality certification, and ISO45001 safety management certification.SILSTAR Workshop Pictures:Certifications
Packaging & Shipping
Exhibition
FAQ
1. Q: How long will your engineer reach our factory? A: Within 7-15 days after the machine arrives at your factory. |
2. Q: How many days will you finish installing? A: We will finish installation and training within 3-7 days. |
3. Q: What should we charge for your engineer? A: You should charge for the cost of our engineer's visa, round trip tickets, accommodation, and also their salary of 100USD one day per person. |
4. Q: How long is your machine's warranty period? A: All our machines have one year guarantee, starting from the finished installation. |
5. Q: How could we do after one year warranty period? A: We also can do service for you, but you need to pay the salary for my technician 100USD/day. |
6. Q: How could we do if the parts are broken within the warranty? A: We would express the free replacement parts during the warranty date. |
7. Q: Does your engineer understand English? A: Our engineer understands a little English. All of our engineers have more than five years machine installation experience. |
8. Q: How many workers do we need to run those machines? A: Usually need one person to operate the machine. |
9. Q: How do we solve the machine problem after your engineer leaves? A: Generally speaking, there will be no problem after finishing the installation. In case you have any problem. You can contact our sales at any time. Our engineer will take a solution video according to your description. |
10. Q: How can I visit your company? A: It takes 30 minutes by train from Shanghai to our factory. |
Prev: Full Automatic High Speed Paper Cup Forming Machine (Debao-118S+SY)
Next: Small Cost Paper Cup Making Machine for Home Busines Paper Cup Making Machine Prices UK
Our Contact
Send now